Home > Home remodeling, Tile > Tile project

Tile project

This bath remodel project shows removal of rotten drywall down to the studs and installation of backer board.

Tile (1)

Notice care to cover the tub during work.

Tile (3)Backer board is nailed with galvanized roofing nails and all seams are taped

Tile (4)Tile detail before grout

Tile (10)Tile detail after grout.

Tile (9)When using large tiles extra care is required for a very level surface. Plastic shims may be used to align corners perfectly.

Tile (6)These corner trim pieces are very effective to create a threshold transition. They are designed as wall trim but are durable on the floor when well supported with setting compound.

 

  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: