Tile

This tile job shows preparation of removing rotten drywall down to studs, installing backer board, setting tile, and grouting. The project includes walls and floor.

Tile (1)Notice care to protect the tub during work.

Tile (3)Backer board is nailed with galvanized roof nails and seams are taped.

Tile (4)

Wall detail before grout

Tile (10)Grouted wall detail

Tile (9)Large tiles require extra care for a very level floor. Plastic shims may be used to align corners perfectly.

Tile (6)These simple corner tiles are very effective to create a threshold transition. They are designed for walls but are very durable when supported with setting compound.

 

 

 

 

 

 

 

  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: